Get App
Download App Scanner
Scan to Download
Advertisement
This Article is From Jan 20, 2020

Two Units at Zimbabwe’s Hwange Thermal Plant Return to Service

(Bloomberg) --

Two units at the Hwange thermal power station have been returned to service after flooding occurred on Jan. 18 and caused the power station to be forcibly shut, the Zimbabwe Power Co. said.

“Units 1 and 4 returned to service this morning, while unit 2 is expected back in service by day end,” the Zimbabwe Power Co. said in an emailed statement. The Hwange power plant was producing 64 megawatts on Monday, according to the utility. It has an installed capacity of 920 megawatts.

The plant was knocked off line with the loss of 400 megawatts because of local flooding. The Southern African nation has been experiencing power cuts lasting as long as 18-hours a day, with output at its hydro power station in Kariba constrained because of a regional drought.

To contact the reporter on this story: Ray Ndlovu in Johannesburg at rndlovu1@bloomberg.net

To contact the editors responsible for this story: Gordon Bell at gbell16@bloomberg.net, Jacqueline Mackenzie, Alastair Reed

©2020 Bloomberg L.P.

Essential Business Intelligence, Continuous LIVE TV, Sharp Market Insights, Practical Personal Finance Advice and Latest Stories — On NDTV Profit.

Newsletters

Update Email
to get newsletters straight to your inbox
⚠️ Add your Email ID to receive Newsletters
Note: You will be signed up automatically after adding email

News for You

Set as Trusted Source
on Google Search