Coal Shortage, Procurement Woes Cost NTPC Rs 11,000 Crore In 2010-16
The Comptroller and Auditor General (CAG) of India has found that state-run NTPC Ltd. shelled out an additional Rs 6,869.95 crore during 2010-16 for procuring domestic coal and missed out on garnering Rs 4,299.80 crore in revenue due to outages at power plants on account of fuel shortage.
Together, it costed the company close to Rs 11,000 crore during 2010-16, CAG noted.
The company incurred additional expenditure of Rs 6,869.95 crore over 2010-16 in procurement of domestic coal even as it lost an opportunity to generate revenue of Rs 4,299.80 crore due to full or partial outages of stations on account of shortage of coal.Comptroller and Auditor General of India's Report
The Performance Audit Report covered fuel management of 13 out of 26 coal-based power stations of NTPC and its Joint Ventures during the period from April 2010 to March 2016.
As per the report, during 2010-11 to 2015-16, 11 out of 13 stations covered, reported a generation loss of 19,546.26 million units with potential revenue loss of Rs 4,299.80 crore.
It said that coal cost constitutes 60-70 percent of the total generation tariff of coal-based power stations and has significant impact on cost of supply of power to consumers.
CAG took up performance audit of fuel management in coal based power stations of NTPC.
According to the report, supply of domestic coal to power stations was governed by National Coal Distribution Policy (NCDP) of Coal Ministry. Domestic coal was supplied to power stations by coal linkages established through Fuel Supply Agreements (FSAs) at prices fixed by Coal India Ltd (CIL).
However, it said that inadequate coal linkages of power stations, delay in signing of FSAs and intra-year shortfall in supplies led to procurement of coal at prices higher than the notified rates.
Power stations also incurred additional cost by way of performance incentives even for quantities within Annual Contacted Quantity (ACQ) and on deemed delivered quantities, premium on MoU procurement, e-auction etc, it said.
Besides, the power stations paid performance incentives for additional annual supplies even as they suffered generation loss due to intra year shortfall in coal supply, it added.
CAG observed that though the company has been importing coal since 2005-06, no comprehensive policy for import of coal was devised resulting in non-uniform decisions regarding splitting of packages among bidders, qualification requirements, re-tendering and annulment of packages.
Imported coal was stored in the same yard along with domestic coal although the former has higher Gross Calorific Value (GCV), which affected the blending ratio of coal, it said
Besides, CAG found that despite very significant quality difference (GCV difference) between domestic and imported coal, the specific coal consumption of the power station was not significantly affected by a change in the quantity of imported coal blended.
It also said that instead of ascertaining transit loss of coal (difference between quantity of coal dispatched from the mines and quantity of coal received by stations) by weighing the railway rakes, an indirect method called 'volumetric method' was used.
There were also concerns regarding accuracy of the stock reported at the stations, considering that some stations reported bigger stocks than the storage capacity of yard, it added.
-
We May Need Another Tukaram Mundhe To Fight Air Pollution | The Reason Why
Developers may install basic measures such as sprinklers and green nets, resume work, and continue violating rules when this equipment stops working.
-
Extracting Value From Battery Scrap Could Be Challenging For India | The Reason Why
A discarded lithium-ion battery still contains valuable materials such as lithium, nickel and cobalt. These can be recovered and reused. When such batteries are crushed and shredded, they produce a dark powder called black mass.
-
One El Nino, India Can Handle. Two Could Break The Granary
India's grain stocks can absorb one bad year, but a second El Nino could drain the buffer in two to three years, economists say.
-
India's Troika Of Good Luck | Joining The Dots
As Jensen Huang's exit drags Nvidia down, a cooling AI trade and resilient earnings have revived investor interest in India. A likely RBI rate hike looms.
-
Talking Points This Week: Leadership Shock At Nvidia, Earnings Strength, And The Fog Over Hormuz
The Anthropic IPO pricing and first trading day, Nvidia's upcoming earnings, and any fresh signals from Iran will set the tone for the following week.
-
Signature Play: The Classic Cocktail Is Dead. Or Is It?
Classic cocktails are disappearing from India's cocktail menus. But they're still being ordered, taught to bartenders and borrowed from. So, who's really having the last drink?
-
A New Samvat Wishlist: Inclusive Prosperity And Human Development
India has strengthened its economic foundations through infrastructure, digital access and enterprise. Its next growth chapter must deepen productivity, create better livelihoods and widen participation in prosperity.
-
Love, Sex Aur Dhokha: The Audacious Plot To Spy On Jensen Huang
A Taipei dinner, a Singapore chip buyer and a suspected Chinese asset: inside the alleged spy operation that got close to NVIDIA's Jensen Huang.
-
Ten Things I Learnt This Samvat
Patience can be a trap. Cheap stocks can stay cheap. Leverage can wipe you out. What did Samvat 2082 teach us? Niraj Shah writes on 10 lessons from the year gone by.
-
Talking Points This Week: Tech Nerves, FII Buying, And A Faraway Banking Shock
The global markets are not shining this Diwali. The exception in the large markets is, India.