Cabinet Clears Rs 8,679 Crore Mumbai Urban Transport Project Phase-IIIĀ 

Cabinet Clears Rs 8,679 Crore Mumbai Urban Transport Project Phase-III 
Passengers disembark as commuters wait to board a train during the morning rush hour at Kurla railway station in Mumbai, India (Photographer: Dhiraj Singh/Bloomberg)

The Union Cabinet on Wednesday cleared a major suburban rail link project worth over Rs 10,000 crore as part of the ambitious urban transport project in Mumbai. Chaired by the Prime Minister Narendra Modi, the cabinet has approved the Mumbai Urban Transport Project Phase-III.

The estimated cost of project is Rs 8,679 crore with completion cost of Rs 10,947 crore. The project is expected to be completed in the next 5 years during 13th Plan period.

Western Railway is running suburban services on the existing busy double line between Virar-Dahanu Road which is a part of main line Mumbai-Ahmedabad/Delhi route. Main line is already over saturated and there is no scope for supplementing suburban services on this line, says a release.

Construction of an additional double line between Virar-Dahanu Road will address the demand of commuters in this region. This will provide extension of suburban services from Churchgate to Dahanu Road. Panvel-Karjat double line suburban corridor will cater to the significant urbanisation and population growth in recent years in this area. This will also provide an alternate route from Karjat to CSTM via Panvel which will be shorter by 23 kilometres than the existing route via Kalyan and will reduce travel time between the Chhatrapati Shivaji Terminus to Karjat by 35-40 minutes by slow trains.

Presently, passengers commuting from Kalyan to Vashi/ Panvel or in reverse direction, have to get down at Thane and take the Trans Harbour link. This results in congestion at Thane which is already a busy station on Central Railway. Airoli-Kalwa corridor will reduce congestion at Thane station and will also save time as these passengers can travel bypassing Thane.

Procurement of new coaches will enhance the quality of service and reduce congestion. The works proposed under trespass control at 22 locations shall significantly reduce trespass and will provide safer environment for the public.

The areas covered by this project are Thane, Palghar, Raigad and Mumbai districts of Maharashtra.

The Mumbai suburban railway network on Central and Western Railways has 376 km route. There are five corridors, two on Western Railway, two on Central Railway and one on Harbour Line of Central Railway.

Every day approximately 8 million people travel in suburban section in more than 2,900 train services. There is severe overcrowding in the suburban trains specially during peak hours. Due to geographical constraints, spread of the population and location of business areas, the railway network will continue to be the principal mode of mass transport in Mumbai.

To meet the demands of the ever growing commuter traffic, new suburban corridor between Panvel-Karjat (28 kilometre route), new elevated corridor between Airoli-Kalwa(3 km route), quadrupling of Virar-Dahanu Road (63 km route), procurement of 565 new coaches and trespass control measures in mid sections have been included in Mumbai Urban Transport Project (MUTP)- Phase III.

Unlock this article for free
Sign up to access exclusive stories, fewer ads, and a personalised experience.
Set as Trusted Source
on Google Search
Add NDTV Profit As Google Preferred Source