Ashwini Vaishnaw Initiates Breakthrough Of 5-Km Bullet Train Tunnel In Maharashtra's Thane

Standing at one of the openings of the tunnel, Vaishnaw pushed the button and triggered a controlled dynamite blast to break through its final layer, completing five km of excavation.

PTI

Mumbai: Railways Minister Ashwini Vaishnaw addresses the media during inspection of Mumbai-Ahmedabad high speed rail project work, in Mumbai, Saturday, Sept. 20. (Image: PTI)

Railway Minister Ashwini Vaishnaw on Saturday initiated the breakthrough of a five-kilometre-long tunnel in Thane near Mumbai, marking a significant achievement in the Mumbai-Ahmedabad bullet train project.

Standing at one of the openings of the tunnel, Vaishnaw pushed the button and triggered a controlled dynamite blast to break through its final layer, completing five km of excavation.

Briefing mediapersons present at the site to cover the event, Vaishnaw called it a 'landmark achievement' and reiterated that the 50-km-long first section between Surat and Billimora will be completed by December 2027.

Vaishnaw appreciated the progress of the project, saying this tunnel is a part of the total 21-km-long tunnel, out of which seven km passes through the sea.

The 508-km-long project will run between Mumbai and Ahmedabad.

Officials said that the excavation was done through the 'drill and blast' method, and henceforth, a tunnel-boring machine will be used.

This 5 km tunnel runs between Ghansoli and Shilphata in Maharashtra.

Also Read: AI Safety In Focus: Ashwini Vaishnaw Says Governance Framework For AI To Be Out By Sept. 28

Watch LIVE TV, Get Stock Market Updates, Top Business, IPO and Latest News on NDTV Profit. Feel free to Add NDTV Profit as trusted source on Google.
GET REGULAR UPDATES
Add us to your Preferences
Set as your preferred source on Google