Govt Extends Subsidy Benefits For Electric Two-Wheelers Under PM E-Drive Scheme

Under the revised PM E-Drive scheme, eligible electric two-wheelers can receive an incentive of Rs 2,500 per kWh, capped at Rs 5,000 per vehicle

Advertisement
Read Time: 2 mins
PM E-DRIVE scheme extended till March 2028 to boost EV adoption
Image: AI generated
Quick Read
Summary is AI-generated, newsroom-reviewed
  • The PM E-DRIVE scheme for electric two-wheelers is extended until March 31, 2028
  • The scheme has a total budget of Rs 11,900 crore focused on EV adoption and manufacturing
  • Incentives for electric two-wheelers are Rs 2,500 per kWh, capped at Rs 5,000 per vehicle
Did our AI summary help?
Let us know.

The government's decision to extend incentives for electric two-wheelers under the PM E-DRIVE scheme is likely to draw attention from investors tracking India's EV sector. This will boost EV adoption while supporting the country's domestic manufacturing ecosystem.

The Ministry of Heavy Industries, in a notification dated August 10, 2026, said the PM E-DRIVE scheme will now continue until March 31, 2028. The scheme has a total outlay of Rs 11,900 crore and focuses on faster EV adoption, charging infrastructure and the development of India's EV manufacturing ecosystem.

Advertisement

Electric Two-Wheeler Subsidy Structure

Under the revised provisions, registered electric two-wheelers will continue to receive purchase incentives for the period from April 1, 2025, to March 31, 2028. The incentive has been set at Rs 2,500 per kilowatt-hour, subject to a maximum of Rs 5,000 per vehicle.

The maximum ex-factory price of an eligible electric two-wheeler has been fixed at Rs 1.5 lakh. The scheme provides support for a maximum of 45,79,120 electric two-wheelers, with total funding support from the Ministry of Heavy Industries pegged at Rs 2,767 crore.

Advertisement

For comparison, the incentive applicable during FY2024-25 was Rs 5,000 per kWh, capped at Rs 10,000 per vehicle. The government has also clarified that the per-kWh incentive could be reviewed depending on reductions in vehicle costs and notified periodically. The incentive will remain limited to the specified amount or 15% of the vehicle's ex-factory price, whichever is lower.

Also read: PM E-Drive EV Subsidy Scheme Comes Into Effect In India Amid Global EV Slowdown

PM E-DRIVE Outlay Capped At Rs 11,900 Crore

The government has reiterated that PM E-DRIVE is a fund-limited scheme. Total payouts will remain capped at the overall scheme outlay of Rs 11,900 crore. If funds for the scheme or any sub-component are exhausted before March 31, 2028, the relevant component may be closed, and no further claims will be entertained.

Advertisement

The notification also states that March 31, 2028, is the terminal date for all scheme segments, while the last date for submitting claims to the Ministry of Heavy Industries or the Project Management Agency will be December 31, 2027.

Also Read: Petrol, Diesel Prices On August 11: Check New Fuel Rates In Mumbai, Bengaluru, Chennai, Kolkata And More

Essential Business Intelligence, Sharp Market Insights, Practical Personal Finance Advice, Daily Fuel, Gold and Silver Prices and Latest Stories — On NDTV Profit.


Loading...