The Ministry of Coal has approved the Pachwara South Coal Block Project by Neyveli Uttar Pradesh Power Ltd. for Rs 2,242.90 crore.
Pachwara South Coal Block, located in Dumka district of Jharkhand, is the coal mine supplier for the 3x660 megawatt Ghatampur Thermal Power Plant, according to an exchange filing released on Thursday.
Pachwara South Coal Block has extractable coal reserves of 262.84 metric tonnes.
Neyveli Uttar Pradesh Power—a subsidiary of NLC India Ltd. and a joint venture between NLC India and Uttar Pradesh Rajya Vidyut Utpadan Nigam Ltd.—will commission the Ghatampur Thermal Power Plant at Kanpur Nagar district of Uttar Pradesh.
Shares of NLC India closed 0.45% higher at Rs 233.30 apiece, as compared with a 0.66% rise in the benchmark BSE Sensex.
RECOMMENDED FOR YOU

SAEL Industries To Set Up Rs 8,000 Crore Solar Facility In Uttar Pradesh


Power Engineers' Body Calls For Nationwide Strike On July 9 Against Uttar Pradesh Discoms Privatisation


NLC India Secures Letter Of Award From NTPC For Hybrid Power Project


Tata Steel Seeks Rs 757-Crore Compensation Over Cancelled Odisha Coal Mine
